Customer

David Ross Education Trust

Project Date

January 2024

Designer

Brian Tynan Design

Site

Charnwood College, Loughborough

Project Value

£329k

Project

Charnwood College, G Block Plant Room

Scope of Work

The project at Charnwood College (G Block Plant Room) was undertaken to upgrade and replace the main heating plant, controls, and associated builders’ work.

  • Safe isolation, strip-out and removal of existing gas-fired boilers, water heaters, flues, pumps, pipework, controls, field wiring, and electrical containment.
  • Installation of:
    • 8 high-efficiency gas-fired boilers with associated flue systems.
    • 1 plate heat exchanger, automatic filling devices, and expansion vessels.
    • New pump sets, control panel, and system controls, fully integrated with the existing Trend BMS.
    • New DHW cylinder to replace the previous water heaters, including all associated hot and cold-water connections.
  • Modifications and connections to existing LPHW, MCW, and gas pipework, including replacement of the main ECV gas valve.
  • Installation of new flue systems, including builders’ work and safe access arrangements for chimney maintenance.
  • Electrical installation works:
    • New switch control panel, power supplies, containment, and field wiring.
    • Integration of sensors and equipment with the BMS.
  • Ancillary works:
    • Upgrades to basement sump pumps, with new discharge pipework and flood alarm system linked to BMS.
    • Installation of condensate, safety valve, AAV, and waste pipework.
    • Thermal insulation with stucco aluminum cladding.
  • Testing and Commissioning:
    • Pressure testing, flushing, and chemical treatment of all LPHW and water services.
    • Balancing, commissioning, and setting to work of all new plant and automatic controls.
  • Handover:
    • Full O&M Manuals issued with “As-installed” drawings and commissioning certification.