01455 632 030  sales@hinckleyplumbing.co.uk

Greenfields Primary School

Customer

David Ross Education Trust

Project Date

August 2025

Designer

Brian Tynan Design

Site

Greenfields Primary School, Kettering

Project Value

Phase 1 – £89k
Phase 2 – £401k

Project

Boiler Plant & Heating System Replacement
Phase 1 – Replacement Boiler Plant
Phase 2 – Full School Re-pipe and Radiator Installation

Scope of Work

  • Isolated, stripped out, and removed existing heating pipework, emitters, boilers, pumps, flues, controls, and associated services from the boiler room and adjoining basement.
  • Safely disconnected and removed redundant electrical supplies, containment, brackets, and fixings.
  • Installed new gas boiler plant, flue system, electronic filling device, expansion vessel, and replacement basement pipework/services.
  • Phased installation of new heating pipework and emitters (radiators and fan convectors), with temporary connections to maintain continuity during works.
  • Installed new local heating controls, fan convector wiring, and temperature controls, including any temporary wiring required for phasing.
  • Supplied and installed new BMS heating control panel with associated hard wiring and containment.
  • Applied new insulation to all pipework, with PIB weatherproofing externally and aluminum stucco cladding in boiler room.
  • Pressure tested all new pipework, flushed and treated the LPHW heating system and water services.
  • Carried out testing, balancing, commissioning, and full setting to work of all new systems and automatic controls.
  • Prepared and issued comprehensive O&M Manuals with “As-Installed” drawings.